Codingassignmenthelper | Home Codingassignmenthelper | University

ITSU3008 Project 1

Victorian Institute of Technology

Assignment :

Page | 1

At Top Project Title
Student ID and Student Names
At bottom Semester X, 20XX

Table of Contents.......Page | 2

01. Executive Summary
02. Introduction
03. Literature Review
04. Gantt Chart
05. Budgeting
06. Hardware Requirements
07. Software Requirements
08. Functional Requirements
09. Non-Functional Requirements
10. Methodology
11. Project Scope
12. Feasibility Analysis
13. Risk Constraint Analysis
14. Use case diagrams and descriptions
15. Network Architecture/ Architectural Diagram
16. Project Flow chart
17. ER Diagram/Protocols and Technologies
18. References

Content:

  • Executive Summary
  • The section should include the executive summary of the project, the summary should discuss the social and ethical aspects of the project.

  • Introduction
  • This section should provide an outline of the Project.

  • Literature Review
  • Each student is required to provide a literature review of 3 research papers each.

  • Gantt Chart
  • Students are required to design a Gantt chart for the Project 1.

  • Budgeting
  • Budgeting of the project including references.

  • Hardware Requirements
  • The section should include the hardware requirements of the Project.

  • Software Requirements
  • The section should include the software requirements of the Project.

  • Functional Requirements
  • The section should include the functional requirements of the Project.

  • Non-Functional Requirements
  • The section should include the non-functional requirements of the Project.

  • Methodology
  • The group should present the methodology they would adopt for the successful completion of the project.

  • Project Scope
  • The project scope defines the scope of the project

  • Feasibility Analysis
  • The feasibility analysis will investigate the practicality of the given project.

  • Risk Constraint analysis
  • The section should include the risk constraint analysis of the project.

  • Use case diagrams and descriptions
  • Use case diagrams and descriptions of the project need to be design and discussed.

  • Network Architecture/ Architectural Diagram
  • The section should include the hardware requirements of the Project.

  • Software Requirements
  • The projects in the networking stream are required to design the network architecture. The projects in the application development stream are required to design the architectural diagram.

  • Project Flow Chart
  • The section should include the project flow chart.

  • ER Diagram/ Protocols and Technologies
  • The section should include the ER diagram for all application development streams and networking streams where applicable. Networking Projects where ER Diagram is not applicable students are required to discuss protocols and technologies.

  • Reference
  • Follow the IEEE style.

    To Download Click Here > ITSU3008 Project-1 Report Template.pdf
    Codingassignmenthelper | Home Codingassignmenthelper | Home